FontToolbox logo

Ganttlets

by Creatype Studio · Website

Ganttlets is a casual brush script with the raw, energetic quality of hand-lettering done at speed with a loaded brush. Thick downstrokes bleed into hairline connectors, and the rough ink texture keeps it grounded and authentic. It reads clearly at large sizes while retaining the kind of looseness that makes it feel genuinely hand-drawn rather than manufactured.

Preview

Live sample
0/180
Ganttlets preview
Ganttlets specimen sheet